Two wall-thickness reports can disagree while both are correct. One measured the base corner with a micrometer after cutting; the other scanned the body with an optical system. The number, the point and the method travel together. Before you buy a gauge or write a specification, decide what the measurement is for: a first-article release, a production audit or a failure investigation.

The short answer: match the method to the decision

Cut-section is the reference method for a first article and for failure analysis: it shows the actual wall, the corner radius and the seam. Automated metrology is faster for a production audit and can trend many points, but it needs a validated correlation to the cut section. Define the six points and the sampling rule first; the gauge is the last decision.

Put the report on one page: part number, cavity, machine, cycle, resin lot, sample weight, the six points with target, minimum and actual, the method, the inspector and the date. Add a photo of the cut plane and the measurement location. If an automated gauge is used, record the software version and the correlation sample. A one-page report is easier to audit than a folder of screenshots, and it makes a customer complaint traceable to a cavity and a shift. Keep the cut samples for the project or the customer's retention period; a photo is useful, but the physical section settles a disagreement. The report should also state what was not measured, so a later request does not look like a hidden failure.

Cut-section versus automated metrology

The two methods answer different questions. Cut-section tells you what the wall looks like at a specific plane, including the material distribution around a corner. Automated metrology tells you whether the process is drifting across many parts. Neither replaces the other.

Measurement methods by use case. The gauge is only one part of the method; sample preparation and point location decide whether the number is comparable.
Method Best use What it shows What to control
Cut-section with micrometerFirst article, failure analysis, mold trialActual wall at a defined plane; corner radius; seam and parison distributionCut position, burr removal, measurement plane and operator technique
Ultrasonic thickness gaugeSpot checks on a finished partWall at the probe point without cuttingProbe contact, material sound speed, curved-surface correction
Automated optical or 3D metrologyProduction audit and trendMany points across a part or sample, repeatablyFixture, scan coverage, correlation to cut-section, software version
Weight and capacity checkEvery shift, as a quick guardTotal material and volume, not local wallScale calibration and fill method

Swipe the table to see all columns →

PETG Clear Bottle Blow Molding Machine | Bottle and Mold View A representative PETG bottle and mold view. The container, mold and measurement points in your project may differ.

The six points to put on the drawing

Six points cover most blow molded bottles and jerrycans. Add points where the container has a handle, a label recess or a deep base.

  • Neck ring: below the thread or tamper band, where the neck insert and blow pin meet.
  • Shoulder: the transition from neck to body, usually the thinnest area after stretching.
  • Upper body: just below the shoulder, at the label panel top.
  • Lower body: above the base curve, at the label panel bottom.
  • Base corner: the radius where the wall turns into the seating surface, measured at a defined height.
  • Pinch-off: the seam at the base or handle, including the flash and the weld line.

For each point, record the height or angle from a datum on the drawing, the expected minimum and the measurement method. If the part is symmetrical, state how many around the circumference are measured. A six-point report on one side of an oval bottle is not the same as a six-point report around the perimeter.

A sampling rule that survives an audit

First article: take at least three consecutive parts from each cavity after the process is stable, cut and measure all six points. Production audit: agree a frequency per cavity and shift, plus a reaction plan when a point falls below the minimum. Keep the raw data, the part weight and the machine cycle with the report, so a later change can be traced.

The process side is covered inblow molding wall thickness controlandwall thickness variation. For a 20 L drum example, read20 L chemical drum production.

What to send for a quotation

A wall-thickness requirement is only inspectable when the point and method are defined. Send these with the enquiry:

  • Container drawing with the six measurement points and their datums.
  • Minimum and target wall at each point, plus the acceptable deviation.
  • Resin, colour and any regrind ratio that can change the wall.
  • Cavity count and the mold layout, so the sample can be traced to a cavity.
  • First-article quantity and production-audit frequency.
  • The measurement method you will use, and whether the supplier must correlate to a cut section.
  • Any customer specification or test report format that must be followed.

Compare the0.1–16 L single-station rangeanddouble-station range, then send the drawing through thecontact page.

Source: E-SHION product data. Specifications are subject to change without notice; customization is available.