Two wall-thickness reports can disagree while both are correct. One measured the base corner with a micrometer after cutting; the other scanned the body with an optical system. The number, the point and the method travel together. Before you buy a gauge or write a specification, decide what the measurement is for: a first-article release, a production audit or a failure investigation.
The short answer: match the method to the decision
Cut-section is the reference method for a first article and for failure analysis: it shows the actual wall, the corner radius and the seam. Automated metrology is faster for a production audit and can trend many points, but it needs a validated correlation to the cut section. Define the six points and the sampling rule first; the gauge is the last decision.
Put the report on one page: part number, cavity, machine, cycle, resin lot, sample weight, the six points with target, minimum and actual, the method, the inspector and the date. Add a photo of the cut plane and the measurement location. If an automated gauge is used, record the software version and the correlation sample. A one-page report is easier to audit than a folder of screenshots, and it makes a customer complaint traceable to a cavity and a shift. Keep the cut samples for the project or the customer's retention period; a photo is useful, but the physical section settles a disagreement. The report should also state what was not measured, so a later request does not look like a hidden failure.
Cut-section versus automated metrology
The two methods answer different questions. Cut-section tells you what the wall looks like at a specific plane, including the material distribution around a corner. Automated metrology tells you whether the process is drifting across many parts. Neither replaces the other.
| Method | Best use | What it shows | What to control |
|---|---|---|---|
| Cut-section with micrometer | First article, failure analysis, mold trial | Actual wall at a defined plane; corner radius; seam and parison distribution | Cut position, burr removal, measurement plane and operator technique |
| Ultrasonic thickness gauge | Spot checks on a finished part | Wall at the probe point without cutting | Probe contact, material sound speed, curved-surface correction |
| Automated optical or 3D metrology | Production audit and trend | Many points across a part or sample, repeatably | Fixture, scan coverage, correlation to cut-section, software version |
| Weight and capacity check | Every shift, as a quick guard | Total material and volume, not local wall | Scale calibration and fill method |
Swipe the table to see all columns →
The six points to put on the drawing
Six points cover most blow molded bottles and jerrycans. Add points where the container has a handle, a label recess or a deep base.
- Neck ring: below the thread or tamper band, where the neck insert and blow pin meet.
- Shoulder: the transition from neck to body, usually the thinnest area after stretching.
- Upper body: just below the shoulder, at the label panel top.
- Lower body: above the base curve, at the label panel bottom.
- Base corner: the radius where the wall turns into the seating surface, measured at a defined height.
- Pinch-off: the seam at the base or handle, including the flash and the weld line.
For each point, record the height or angle from a datum on the drawing, the expected minimum and the measurement method. If the part is symmetrical, state how many around the circumference are measured. A six-point report on one side of an oval bottle is not the same as a six-point report around the perimeter.
A sampling rule that survives an audit
First article: take at least three consecutive parts from each cavity after the process is stable, cut and measure all six points. Production audit: agree a frequency per cavity and shift, plus a reaction plan when a point falls below the minimum. Keep the raw data, the part weight and the machine cycle with the report, so a later change can be traced.
The process side is covered inblow molding wall thickness controlandwall thickness variation. For a 20 L drum example, read20 L chemical drum production.
What to send for a quotation
A wall-thickness requirement is only inspectable when the point and method are defined. Send these with the enquiry:
- Container drawing with the six measurement points and their datums.
- Minimum and target wall at each point, plus the acceptable deviation.
- Resin, colour and any regrind ratio that can change the wall.
- Cavity count and the mold layout, so the sample can be traced to a cavity.
- First-article quantity and production-audit frequency.
- The measurement method you will use, and whether the supplier must correlate to a cut section.
- Any customer specification or test report format that must be followed.
Compare the0.1–16 L single-station rangeanddouble-station range, then send the drawing through thecontact page.
Source: E-SHION product data. Specifications are subject to change without notice; customization is available.
This guide is written for production and procurement decisions. It uses published figures where available and avoids unverified performance claims.