Incoming components
Purchased components and materials are received against the purchase specification. Key component documentation can be requested for the ordered configuration.
Quality & factory
The catalog shows machines in assembly, finished rows and export packing. Below is the check sequence a buyer can discuss when specifying an order — with the limits of what can be claimed stated plainly.
Check sequence
Purchased components and materials are received against the purchase specification. Key component documentation can be requested for the ordered configuration.
Frame, clamping unit, extruder and die-head assembly are built against the machine drawing, with alignment and clearance checks.
Wiring, control functions, hydraulic pressure and leak checks are carried out as part of commissioning.
Heating, clamping, extrusion, blowing sequence and control response are verified before packing. The agreed test scope is written into the order.
Surfaces are protected, the machine is wrapped and secured, and the packing list is prepared for container loading.
What this page does not claim
This page does not state that the company holds CE, ISO or another certification, because those documents must be checked for the specific model, manufacturing period and destination. Ask for the current document package with your quotation.
Third-party inspection
If your project requires third-party inspection or a witnessed test, raise it before the order is placed so the schedule, scope and documents can be agreed.
From the media archive
Next step
Component documentation, test scope, certification package and inspection plan can all be discussed before the order is placed.