Two shifts are full, the third shift is running, and orders still quote four weeks out. The reflex is to ask what a second machine costs. The better question is what an extra hour of capacity costs, because a third shift, a duplicate mold and a second machine release very different hours at very different prices, and only one of them becomes fixed capital.
Start with utilization, not revenue
Add a second machine when utilization stays above 85% for two to three months and the missing hours cannot be recovered from a third shift, a duplicate mold or a shorter changeover. Below 85%, fix the schedule first; above 95%, orders are already going elsewhere.
Revenue proves demand exists. Utilization proves whether you can serve it with what is already on the floor. Two plants with the same order book can need opposite answers: one is short of hours, the other is short of scheduling, and a new machine does not fix the second one.
- Utilization measured as good parts shipped against planned hours, over three consecutive months.
- The gap between the cycle time in the quotation and the cycle you measure on the same mold.
- Hours lost each week to mold changes, material changes and restart scrap.
When the first number sits below 85% and the third is large, the cheapest capacity on the site is already installed.
Two ceilings: extruder and cycle
Capacity in extrusion blow molding is two numbers, and the lower one governs. The extruder ceiling is plasticizing capacity divided by shot weight: at 100 kg/h a machine can fill 200 parisons an hour with a 500 g shot, but only about 111 with a 900 g shot. No mold change alters that.
The cycle ceiling is 3,600 divided by measured cycle time, multiplied by cavities. Four cavities at a measured 14 seconds gives about 1,028 parts an hour; the same tool at 11 seconds gives about 1,309. Both are numbers to check on a test, not to assume from a quotation.
Planning capacity is the lower of the two, multiplied by the hours you can really run and by your own good-part rate. If the extruder is the ceiling, extra cavities will not help. If the cycle is the ceiling, a larger screw will not help.
- Hours available after holidays, maintenance and mold changes, not 8,760.
- Shot weight including flash and scrap you remelt, not just the finished part.
- Measured cycle time on the mold and material that will actually run.
- Your own good-part rate, taken from a production report rather than a target.
The ten models, side by side
The table lists published plasticizing capacity and clamping force for the single- and double-station models from 0.1 to 50 L. The last column converts output into parts per hour at a 500 g shot so both ceilings can be read on one line; substitute your own shot weight.
| Model | Output (kg/h) | Clamp force (kN) | Parts/h at 500 g |
|---|---|---|---|
| ES-2LS | 50–55 | 100 | 100–110 |
| ES-5LS | 65–80 | 100 | 130–160 |
| ES-10LS | 80–100 | 110 | 160–200 |
| ES-16LS | 100–120 | 155 | 200–240 |
| ES-2LD | 60–80 | 100 | 120–160 |
| ES-5LD | 100–120 | 100 | 200–240 |
| ES-10LD | 130–160 | 110 | 260–320 |
| ES-16LD | 130–160 | 155 | 260–320 |
| ES-30L | 100–120 | 215 | 200–240 |
| ES-50L | 110–160 | 260 | 220–320 |
Swipe the table to see all columns →
Read the table as an upper bound. Clamp force across the same range runs from 100 to 260 kN and has to be checked against mold projection area and blowing pressure, not container volume: a tall 20 L container and a squat 20 L container do not load the clamp the same way.
What a third shift buys before capital
A third shift is almost always the first move, and often the right one. Going from two shifts to three adds about 50% more machine hours on the same mold, the same floor space and the same crew skills, and it can be stopped if demand falls.
- Below 70%: capacity is not the constraint. A second machine adds depreciation to a demand problem.
- 70–85%: recover hours before spending. A duplicate mold, a second set of blow pins, pre-heating and off-machine changeovers often release more hours than a capex request.
- 85–95%: run the third shift, then plan. At this level one breakdown or one late material delivery becomes a missed shipment.
- Above 95%: orders are already being allocated. The second machine is a delivery decision, not a cost decision.
The third shift has a ceiling that is easy to miss. Extra hours are the same machine hours: more run time means more wear, and maintenance gets pushed into the weekend until it stops being optional. Above roughly 85%, the maintenance and quality cost of those hours starts to compete with the depreciation on a second machine.
When changeover makes the second machine cheaper
Take a plant running two products on one machine, with example inputs only: a 1 L bottle at 28 g on a four-cavity mold and a 5 L jerrycan at 180 g on a two-cavity mold. On an ES-10LS at 80–100 kg/h the extruder could feed roughly 3,500 small bottles or 550 jerrycans an hour. The cycles decide the rest: four cavities at 12 seconds gives about 1,200 bottles, two cavities at 30 seconds about 240 jerrycans. The cycle is the ceiling in both cases.
Now add changeover. If the plant swaps molds twice a day and each swap takes four hours including warm-up and first-article approval, it loses eight hours a day, half of a two-shift day. At that rate the second machine is not a capacity purchase; it is a changeover purchase. One machine holds the high-volume bottle, the other absorbs short runs, and the hours recovered pay for it before the extra litres do.
If the second machine will run 0.1–16 L containers, compare thesingle-station 0–16 L rangewith thedouble-station 0–16 L rangeon output per hour and clamp force, then run the numbers through themachine ROI framework.
What to send for a quotation
A supplier cannot size a second machine from a container photo. Send the points below and the answer becomes a configuration instead of a guess.
- Container drawing: volume, weight, neck finish, wall-thickness tolerance and material grade.
- Mold position: cavity count, existing tool or new one, and the drawing number if you have it.
- Demand: monthly good-part volume per SKU, how many SKUs, and how often each one changes over.
- Shift pattern and measured utilization: hours available, hours run and the cycle you measure today.
- Site: available power, compressed air, chilling, and the floor space and lifting for another machine.
- Destination: country, port, voltage and the document set you need.
If you are still unsure which ceiling is holding you back, themachine structure overviewexplains where the extruder, clamp and blow system each set a limit, and you cansend your numbers to our teamfor a check.
Source: E-SHION product data. Specifications are subject to change without notice; customization is available.
This guide is written for production and procurement decisions. It uses published figures where available and avoids unverified performance claims.