A lower machine price can still mean a more expensive production line. The machine price is paid once; material, energy, labor and scrap are paid on every bottle. Ask what one good bottle costs and how many the line can sell monthly.
The short answer: cost per good bottle, then capital recovery
ROI asks what one good bottle costs and how much contribution the line generates monthly. Bottle cost = (material + energy + labor + consumables + mold amortization) ÷ good bottles. Payback = total project investment ÷ monthly contribution.
Plain rule: if you cannot state four numbers — part weight, measured cycle time, good-part rate and local power tariff — treat any payback figure as a guess. Get them first; comparison becomes arithmetic, not impression.
The five lines in a bottle's cost
Keep the lines separate. Folding capital recovery into variable cost hides where the money goes and blocks comparison.
- Material. Part weight × resin price ÷ good-part rate, less recovered regrind value. Here, 10 g on a 160 g bottle is about 6% of material cost.
- Energy. Metered kWh per hour × tariff ÷ good bottles per hour. Nameplate power is not consumption: ES-5LS lists 32–42 kW installed, ES-10LS 38–48 kW, ES-30L 100–110 kW.
- Labor. Operators per shift, including take-off and packing, × hourly cost ÷ good bottles per hour. Automation changes this line and first cost together.
- Consumables and spares: pinch-off inserts, filters, lubricants and small wear parts. Small per bottle, but still variable cost.
- Mold amortization. Mold cost ÷ planned good parts. Market ranges: roughly USD 2,000–5,000 for a simple two-cavity mold and USD 15,000–35,000 for larger multi-cavity tools; lead time commonly 20–60 days after drawing approval. Confirm in the quotation.
Two worked examples: 5 L and 20 L
Both assume two shifts and 90% good parts. The 5 L bottle uses two cavities and a 30 s example cycle; the 20 L container uses one cavity and a 55 s example cycle. Placeholder inputs: resin USD 1.20/kg, power USD 0.10/kWh, labor USD 3.00/operator-hour; not local quotes.
| Cost line | 5 L HDPE bottle (example) | 20 L HDPE container (example) |
|---|---|---|
| Example inputs | 160 g, 2 cavities, 30 s, 90% good | 700 g, 1 cavity, 55 s, 90% good |
| Good output | 216 per hour | 59 per hour |
| Material | USD 0.21 | USD 0.93 |
| Energy | USD 0.012 | USD 0.11 |
| Labor | USD 0.014 | USD 0.10 |
| Mold amortization | USD 0.002 | USD 0.02 |
| Cost per good part before consumables, regrind credit and overhead | about USD 0.24 | about USD 1.16 |
Swipe the table to see all columns →
Material dominates the cost shown: about 88% of the 5 L cost and 80% of the 20 L cost. Resin price, part weight and wall-thickness control matter more than a modest machine discount. Energy and labor matter more where power is expensive or automation limited.
The output formula is worked through in the blow molding cavity and output calculation; machine price bands are in the blow molding machine price guide.
Payback: project total against monthly contribution
Payback starts from the whole project: machine + mold + auxiliaries + freight, insurance and installation + working capital for resin, spares and receivables. Machine-only market ranges are roughly USD 25,000–70,000 for 1–5 L and USD 40,000–90,000 for 5–30 L; the final price depends on model, mold, cavity layout, material, drive/control and destination. Confirm the scope in the quotation.
Contribution per bottle = selling price − variable cost (material, energy, labor, consumables). Mold amortization and depreciation are capital recovery; if already in bottle cost, do not subtract again.
Example: table output, 5,000 hours/year. 5 L line: 216 bottles/hour × 5,000 = 1.08 million bottles; at USD 0.08 contribution, USD 86,400/year. Example project: machine 45,000 + mold 3,000 + other project costs 25,000 = USD 73,000, about 10 months. 20 L line: 59 containers/hour × 5,000 = 295,000; at USD 0.35 contribution, USD 103,250/year. Example project: machine 75,000 + mold 20,000 + other project costs 50,000 = USD 145,000, about 17 months. Arithmetic examples, not forecasts.
What to send for a quotation
A quotation you can put into the formula needs:
- Container drawing or 3D file with neck, handle and base detail; volume, part weight, wall thickness and material.
- Target good output, shift pattern and annual operating hours.
- Measured cycle time and good-part rate from an existing line, if you have one.
- Local electricity tariff, available power, water, compressed air and floor space.
- Resin price, regrind policy and existing mold, if any.
- Destination port and delivery terms.
A sample with a ruler in the photo and its part weight is enough to start.
Send the details through the contact page, or review the 0–16 L single-station series and the 20–50 L single-station series.
E-SHION MACHINERY, Taizhou, Zhejiang, China. https://www.e-shionmachinery.com. WhatsApp +86 151 6778 9726. Email doris@e-shionmachine.com
Source: E-SHION product data. Specifications are subject to change without notice; customization is available.
This guide is written for production and procurement decisions. It uses published figures where available and avoids unverified performance claims.