A machine quotation is easy to compare and hard to verify. Two suppliers can quote the same 10 L container line, look equally close on price, and only one of them has a clamp envelope that accepts the mold you already own. If the die plate is wider than the platen, if the mold stack is deeper than the daylight, or if the clamp cannot hold the projected area at blowing pressure, the line does not run at the quoted output — and the mistake usually surfaces after the deposit, when the mold drawing reaches engineering.
The fit checks, in order
Work in this order: platen and die plate, then daylight against mold stack height, then clamp force against projected area, then mold weight and take-out clearance. Each check can rule out a model on its own, so run them before you compare price or output.
Platen and daylight: the dimensional checks
The platen is the mounting face; the die plate carries the locating pins, water manifold and clamping bolts. A mold can be small in container size and still fail here: a multi-cavity layout, a wide die plate or a side-mounted water block makes the footprint larger than the platen. Check the bolt pattern and the distance from the mold centre to the tie bars, not the container volume.
Daylight is the platen spacing published for each model — the gap the mold stack must fit into. Published ranges run from 145–505 mm on the ES-5LS to 400–1000 mm on the ES-50L (table below). The mold stack, back plates and any spacer must close inside that range with clamping allowance left. The open end matters too: opening stroke must clear the finished container and the take-out path, and stroke is not published per model — request it with the mold drawing.
Two points are easy to miss. A mold that only just fits the upper daylight limit often leaves no room for a stripper plate or a take-out robot. And mold height and mold weight are separate limits: a mold can fit the gap and still be too heavy for the handling arrangement.
Clamp force, mold weight and services
Clamp force is set by the mold, not by the container volume. The projected area of the container — including the flash land and the neck — multiplied by blowing pressure gives the separating force the clamp must resist. A wide, flat 5 L bottle can demand more clamp than a tall, narrow 10 L bottle.
The calculation itself is covered inclamp force versus projected area; this article keeps to the envelope.
Platen size does not set the mold weight limit either. The weights in the table — 3.5 t for the ES-2LS up to 13 t for the ES-50L — are machine weights. Maximum mold weight, lifting points and the mold-change arrangement (hoist, mold carriage, quick-change trolley) are engineering details. Ask for them in writing for the model you shortlist, and say how you plan to change molds.
Services belong in the envelope as well. Water connections on the mold back plate need clearance and a hose route; a manifold that sits where the clamp cylinder or the take-out arm travels will stop the job even though the mold fits. Check water, air and hydraulic lines on a layout drawing, not in a phone call.
Clamp envelope across ten models
The table is the published clamp envelope for the single-station and double-station ranges. Shortlist with it, then confirm the fit against the mold drawing.
| Model | Clamp force | Platen (W × H) | Platen spacing (daylight) | Machine weight |
|---|---|---|---|---|
| ES-2LS | 100 kN | 290 × 320 mm | 150–385 mm | 3.5 t |
| ES-5LS | 100 kN | 320 × 380 mm | 145–505 mm | 4.5 t |
| ES-10LS | 110 kN | 450 × 480 mm | 220–600 mm | 6.5 t |
| ES-16LS | 155 kN | 500 × 490 mm | 230–620 mm | 7 t |
| ES-2LD | 100 kN | 290 × 320 mm | 150–385 mm | 4.5 t |
| ES-5LD | 100 kN | 320 × 380 mm | 145–505 mm | 6 t |
| ES-10LD | 110 kN | 450 × 480 mm | 220–600 mm | 8 t |
| ES-16LD | 155 kN | 500 × 490 mm | 230–620 mm | 10 t |
| ES-30L | 215 kN | 580 × 740 mm | 350–800 mm | 10 t |
| ES-50L | 260 kN | 880 × 780 mm | 400–1000 mm | 13 t |
Swipe the table to see all columns →
Where molds fail the envelope on the floor
A mold that is marginal on paper usually shows up in one of three places. The die plate fouls the tie bars during installation, so the mold cannot be centred; the fix is a smaller mold base or a different platen layout, not a longer bolt. The stack closes but the take-out cannot reach the neck, because daylight consumed the space the robot needed. Or the clamp holds at low blow pressure and the flash thickens at the seam on the first run, because projected area was estimated from container volume instead of the mold face.
None of these is a machine defect. All three are envelope mismatches that a drawing review catches in an hour, which is why the fit check belongs in the enquiry — before the model is fixed and long before the price is negotiated.
What to send for a quotation
A quotation is only as good as the mold data behind it. Send these with the enquiry and the fit check can be done before a model is proposed:
- Mold drawing (3D or 2D) with die plate dimensions, bolt pattern and stack height.
- Container drawing with capacity, neck finish, weight and wall-thickness target.
- Cavity count and layout, and whether the mold already exists.
- Material and layer structure — single layer, or multi-layer with EVOH or regrind.
- Target output per hour and shift pattern.
- Available power, water and compressed air at the site.
- Destination country, voltage and documentation needed.
Cross-check the list against ourblow molding machine RFQ checklist.
With those, E-SHION can confirm platen fit, daylight and clamp force for the model, and quote machine and mold together. As a market frame only, 5–30 L extrusion blow molding machines are commonly quoted around USD 40,000–90,000; that is not an E-SHION price, and the final figure depends on model, mold, cavity layout, material, drive/control and destination.
Machine families are listed undersingle-station 0–16 Landdouble-station 0–16 L. For related reading, see12 L container productionandmaximum container size.
Source: E-SHION product data. Specifications are subject to change without notice; customization is available.